Ir Dr Ling Lloyd
Consultancy Work
  • consultant for the 'preparation of flood damage curves', June 2017 - December 2017.
  • forensic analysis on vehicle combustion, January 2018.
  • technical advisor for reclamation works at teluk muroh, lumut, February 2019.
  • technical advisor for reclamation works at teluk muroh, lumut, February 2019 - May 2019.
  • speaker for engineering topics, December 2019 - January 2020.
  • development of rainfall-runoff modelling with the calibrated curve number model, September 2021 - December 2021.
  • oil palm plantation and rainfall-runoff study, April 2023 - April 2023.