Dr Hau Lee Cheun
Funding in UTAR
  • optimal strategy for the recuperation of regenerative braking energy for electric rail transit systems, UTARRF, July 2021 - June 2022.
  • outdoor autonomous robot base for agriculture purpose, AIIOT SDN. BHD., September 2021 - March 2023.
  • cloud-based virtual energy storage using second-hand batteries and refrigerators for renewable energy, AAIBE, March 2021 - March 2024.
  • incremental learning-based pseudo-input peak reduction controller for battery storage with photovoltaic system, UTARRF, July 2023 - June 2024.
  • research and development of an autonomous mobile robot, ALTRAMATION MANUFACTURING GROUP SDN BHD, September 2023 - August 2024.
  • product quality grading project, CSC STEEL SDN BHD, December 2021 - December 2024.
  • optimal scheduling of cloud-based virtual energy storage system benefitting to both end-user and power grid, SARAWAK ENERGY BERHAD, January 2023 - December 2024.
  • research on comprehensive investigation on distribution network design and policy reform to enhance competitiveness in facility expansion and infrastructure investment., PERUNDING SHANU SDN. BHD., April 2024 - March 2025.
  • autonomous differential drive robot base with 3d slam capabilities, GREATECH INTEGRATION (M) SDN BHD, April 2022 - March 2025.